Factory-direct · Shenzhen, China · CAIMEN Group
Home / Products / Parking Barrier Price Guide

Parking Barrier Price Guide

No single list price is honest — a 4 m arm and a 6 m truck arm are different machines. Here is exactly what moves the number.

Parking Barrier Price Guide — product photo

Barrier pricing is driven by five variables, and quoting without them produces a number nobody can hold. Below is how each one moves cost, so you can compare supplier quotes on equal terms. Send your lane count, arm length and detection requirement and we return a firm factory-direct quote within one business day.

Arm length and dutyLonger arms and 100% duty drives for truck lanes cost more than standard 4 m units.
Detection layerLoop only is the base; ANPR, RFID or intercom release each add hardware and commissioning.
Software scopeCard/QR only, or full platform with permits, pricing rules and dashboards.
Installation and civil worksFoundation, cabling and loop cutting are site-dependent — we quote them separately and transparently.

Ready to size this for your site?

Send your opening dimensions and a site photo — our engineers return a spec-matched configuration and quote within 1 business day.

Get a Quote
Specifications

What is included in a quote

Key specifications — full datasheet on request.
Barrier unitDrive, arm, controller, safety edge and loop detector
DetectionInduction loop standard; ANPR / RFID / intercom as options
SoftwareLicence or subscription, per site or multi-site
DocumentationFoundation drawing, cabling schedule, commissioning checklist
InstallationOptional — by our team or your local contractor with our drawings
WarrantyStandard warranty on drive and controller; terms by contract
Spare partsRecommended spares list issued with the quote
Payment termsAgreed per order; export terms available
FAQ

Common questions

Why can't you publish a fixed price?
Because arm length, duty cycle and detection change the bill of materials. A published single price would either overcharge small sites or under-deliver on truck lanes.
How fast is a quote?
One business day from receiving lane count, arm length and detection requirement.
Do you supply samples or drawings before ordering?
Yes — foundation and lane layout drawings are issued at quotation stage so your contractor can price civil works.

Related products

WhatsApp Get a Quote